Kennedy Highway CN-11562.

This project consisted of road widening for up to 6km for wide centreline treatment and intersection upgrades.
To achieve this the project required substantial cut and fill areas, culvert extension and drainage upgrades.
The pavement was constructed using lightly bound subbase and base materials. Saturated areas required rock mattress treatments and sub soil drains.
Drainage upgrades included gabion rock baskets and rock protection.

Description: Kennedy Highway CN-11562 Section 3

Client: Department of Transport and Main Roads

Location: Kennedy Highway (32A) 31.00km – 37.00km