Kennedy Highway CN-11565

Kennedy Highway CN-11565. RCG worked closely with the client to deliver road safety improvements on a section of road from the entrance to Mareeba along two sections of 1.5kms east towards Kuranda.  The road safety improvements include pavement widening and...

Kennedy Highway CN-11562

Kennedy Highway CN-11562. This project consisted of road widening for up to 6km for wide centreline treatment and intersection upgrades. To achieve this the project required substantial cut and fill areas, culvert extension and drainage upgrades. The pavement was...

Kennedy Highway CN11566

Kennedy Highway CN11566 This project consisted of widening almost 3km of road to include overtaking lanes, wide centreline treatment and intersection upgrades. To achieve this the project required substantial cut and fill areas, culvert extension and drainage...

Project Millaa Millaa CN-12014  

Millaa Millaa—Malanda Road CN-12014 The scope of works includes rehabilitation works on the Millaa Millaa – Malanda Road (641) between 3.43km – 6.32km and includes pavement overlay, drainage works and bitumen surfacing. Description: Millaa Millaa Malanda Road CN12014...

Project Palmerston CN13339

Kennedy Highway CN-13339 This project demonstrates what can be achieved when the client and principal contractor work together to achieve the best results. The project was on a notorious section of road that had been reworked under multiple contracts. RCG collaborated...